Fri May 15 2009

Drilling the new firewall weldment

This evening I match drilled the new firewall weldment to the lower longeron and the auxiliary longeron. I also match drilled through the stiffener angle clip into the vertical firewall stiffener. I had planned on installing all five of these rivets, but the lower two need shot/bucked, so I'll have to wait on a helper until then.