This morning, I and about a dozen others helped Bob Leffler move his RV-10 project from his garage to his hangar at the Delaware airport (DLZ).
The fuselage was the last big piece to unload.
Much hangar flying was had while preparing for the lift down.
Success!
Bob has much more room in the hangar to work and I'm sure he and his wife will be glad to have their cars back in the garage.
After getting back home, I made up a drilling jig to speed the process of drilling the flanges on the floor stiffeners and ensure consistent results.
Two clamps to hold the stiffener on, drill seven holes through the angle, rinse, repeat.