I spent some time today working on getting the fuel line tubing routed from the fuel
control valve through the landing gear weldment and out the hole in the side of the
fuselage. I made several test pieces. It doesn't look like I'm going to be able to
use two 90 degree bends for this joggle.
Hard to see, but I'm trying to phenagle the tubing all the way from the valve in one
continuous piece. I have some AN unions which I can use as plan B if it's not possible
to get-er-done in one go. We'll see.